Serving Southern Michigan, Grand Rapids, Lansing, Wyoming
Click on a photo to enlarge.
Removed original deck, that was settling and pulling away from the house and had Improper footings, improper joist spacing, improper beams. Installed new treated deck with footings , 4x6 support posts , 16" oc joists, stairs and handrail. Deck is now safe to use.
Remove the decking and railing from the existing deck.
Added an additional 12x12 deck addition to the original deck. Using treated deck boards and new handrail with round aluminum spindles on the entire deck. Removed and replaced the existing stairway with new
Added a 4x8 extension to the existing deck
Stairs made from slabs of stone became a little too rough for elderly Mother to get up and down. Infinity Home Improvement using the Regal rail system, added a continuous rail for her to grasp and stay safe.
A loving family had a cement walkway in front of their house with steps and wanted a brand new deck with railings in place of the old walkway.
In order to do that, we decided to replace their cement walkway with treated lumber steps and railings with 4-1/4" rise per step vs the 8-10" concrete steps and landing. This made the steps easier to navigate safely even for children to climb.
We also decided to bring up the landing height up to the bottom of the entry door, eliminating the tripping hazard that was previously 9" before.
Now the homeowners have a new deck and railings that also added value to their wonderful home.
our service area